I know this is a silly question and I should know the answer - but I don't. So there. I have always wanted a lift and I'm old enough, I've worked hard, saved money so I'm going to get one. It's a "BendPak Model HD-9ST Four Post lift". The salesman asked if I wanted 110 or 220. What's the difference? Will it matter in the operation of the lift? Are there pros and cons? I have to wait 2 weeks for the concrete to cure so I'm not in a big rush. Just a little excited and anxious.

post-309-0-47072000-1363148281_thumb.jpg

Posted

The 110V model is a little bit slower-not much. I have a BP HD14 220V and a Rotary 12,000-it too a 220. I always tend to gop a Bit heavy duty as it seems to last longer.. Search the "Garage Journal" site for tons of info on 4 post lifts.

Posted (edited)

Biggest difference is on 220 you will use about half the amps as you will with 110. If you have 220 go with it as you will be happier in the long run.

Edited by dezeldoc
Posted

Standard household connection here in Oz is 240volts, but you can get 415 volts connected to run heavy duty garage & workshop  equipement..........andyd

Posted

suggeest you study where in the shop you going to locate the lift..personally I have found that the best place is to have the electrical outlet handing from the ceiling so as not to have to trip over the power wire as you walk about doing your work..also a retractable air hose if you have piped compressed air should be at the front corner  of the lift along with a retractable electrical drop light..I have mine all mounted to the overhead joists..I also operate my lift with 110 power and there has never been an issue ...as it is just a motor spinning a hydraulic pump...

Posted

Thank you for your comments. I spoke to the general contractor who wired the garage. He gave me a long explanation and at the end said 110 would be good enough. 2 to 3 weeks - I feel like a little kid at Christmas.

Posted (edited)

If you are ever going to buy any welding equipment in the future then go with 220.

Edited by Mike Petersen
Posted

Thank you for your comments. I spoke to the general contractor who wired the garage. He gave me a long explanation and at the end said 110 would be good enough. 2 to 3 weeks - I feel like a little kid at Christmas.

When you built the garage did you specify what you wanted?

Posted

When the garage was built the contractor put in a 220 breaker in case I would ever need one. For as much as I will use the lift he suggested that 110 would suit my needs.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Terms of Use