Last night I machined a push pin on the lathe so I could press the worm gear off the shaft.  I'm happy to report the job went well. I lifted my hydraulic press with the gantry crane and set it on a wood frame made from 4x6s and 4x4s that I had made previously for a different job.  The worm gear removal went well, it didn't take the full 20 tons but it definitely let go with a bang and moved about 1/8".  After that it didn't take much effort to press it out the rest of the way.

 

  20200828_162851x.jpg.1654e9b5aafae5bbbdb35e5be0ed1bb2.jpg

 

Next I tackled the sector shaft roller replacement.  The pin that the roller rides on is basically riveted in place on both ends.  I'm not sure how much tonnage it takes to rivet a 1/2" diameter hardened pin but I'm sure it's a bunch.  Removing the old pin was a challenge.  There is no part of the sector shaft that is flat, square, parallel or perpendicular.  I ended up clamping it in my milling machine vice and with a center drill in the quill I did my best to eyeball the center of the pin.  At the same time I had to level the top of the pin so it was parallel with the table.  This was not the easiest thing to do but I actually succeeded surprisingly well!

 

20200828_152859x.jpg.4f90e27f67d436314de6047cd09fc3fc.jpg

 

 

 

I was able to start a hole in the center of the pin with the center drill  After that I tried a HSS endmill and found out rather quickly just how hard the pin was.  My second attempt was with a 1/2" carbide drill bit that I've had kicking around my tool box for over 30 years.  I bought it for one job and never used it again until today.  I believe it will need to be sharpened before I can use it again.  But , it did its job.

 

20200828_155726x.thumb.jpg.de0b0213d27549011f31e1521033fda5.jpg

 

 

I almost hit the center of the pin dead nuts.  You can tell by the metal ring that snapped off when I started pressing the out the pin.  I doubt that I could get that lucky again if I tried.

 

20200828_161203x.jpg.0cc7907cb4021838305ceecb0cbb16d0.jpg

 

 

On the left is the original roller, pin and shims.  On the right are the replacement parts.  The kit states that the thickness of the replacement parts is slightly larger to account for wear and warns that the roller needs to be centered in the housing to work properly.  Herein lies the next problem.  My original roller and shims measured 1.1345" in overall width.  The replacement roller and shims measure 1.152".  The new parts are .0175" wider than the original.  The fit of the original was nice and snug in the pocket and spun smoothly.  The new parts aren't close to fitting.  I measured the individual width of the rollers and the original was .969" and the new one is .977" which is .008" wider.  This means I can't swap shims to makes things fit.  The only option I can come up with is to take the new roller and shims to the machinist down the street and have him surface grind the two new shims to remove .0087" from each shim.  

 

20200828_170757x.jpg.aa3ac459324dffbd4a3d327e4d29c608.jpg

 

 

Once all that is done I'm left with one last problem which is how to fix the new pin in place.  The kit instructions suggest that if I don't have a riveting press handy to rivet the pin in place I can weld each end to the sector housing.  I have a feeling that's the approach I'm going to have to take.

 

I'll update things as I make progress.

 

Oh yeah, one more minor problem!  With my current hydraulic press configuration I don't know how I can press the worm onto the steering shaft.  The bottom of the shaft needs to be press against a solid surface that is part of the press.  Looks like I'm going to have to do some jury rigging to my press to get the job done. 

 

Needless to say this job is not a simple take the old parts off and put the new parts on type of job!

 

Brad

 

  • Like 2
Link to comment
Share on other sites

Appreciate the info and time you took to start this rebuild back up.  I am placing my order with CHS on Monday, so not that far behind you.  Also going to be looking around for local machine shops as well.  Will let them get the roller pin out and install the new roller and pin. 

Link to comment
Share on other sites

On 8/28/2020 at 6:29 PM, JBNeal said:

Kinda reminds me of putting a re-ringed piston back in the block, requires a sleeve to line everything up...

 

It's going to be interesting because the roller bearings are not caged, however the did come pre inserted in the roller with a small cardboard tube holding them in place.  I believe when the shaft gets pushed through the roller the cardboard tube will push out the other end.

 

I'm just about done modifying my press so I can press the worm on.  That task should be completed tomorrow.  

 

I got to thinking about how to rivet the ends of the shaft and had the idea of using set screws instead.  My thought is to drill and tap holes, maybe 10/32 or 1/4-20, and then grind divots in the shaft in the appropriate spots for the set screws to screw into.  At the moment I can't think of any downside to doing this.  Maybe someone else can poke holes in this idea :)

 

Brad

 

Link to comment
Share on other sites

Just for insurance, push that cardboard tube halfway out and apply grease to the bearings, then flip it over and repeat, just to keep the bearings held in place in case ya get a case of the butterfingers...

 

The last time I cold riveted anything, the rivet already had a head formed on one end...maybe that new shaft could be worked before install...which means ya might need to machine out a setting die so ya can whop the bejeezus outta one end of that li'l shaft...but then the other shaft end would need to be mushroomed or welded, so that might be too much work compared to the set screw approach...the last few small shafts I've worked with, I ended up putting a dimple in the middle of the shaft end since they were seated in tight bores...that dimple was just enough to restrict the shaft from coming loose, but still allowed the shaft to rotate a little, allowing for lubrication...

  • Thanks 1
Link to comment
Share on other sites

11 hours ago, JBNeal said:

Just for insurance, push that cardboard tube halfway out and apply grease to the bearings, then flip it over and repeat, just to keep the bearings held in place in case ya get a case of the butterfingers...

 

Yeah, that's a good reminder.  One thing of note, the new roller bearings are about twice the diameter of the older bearings.  Not sure if that makes any difference, I guess I'll find out if it does  :)

 

 

 

11 hours ago, JBNeal said:

The last time I cold riveted anything, the rivet already had a head formed on one end...maybe that new shaft could be worked before install...which means ya might need to machine out a setting die so ya can whop the bejeezus outta one end of that li'l shaft...but then the other shaft end would need to be mushroomed or welded, so that might be too much work compared to the set screw approach...the last few small shafts I've worked with, I ended up putting a dimple in the middle of the shaft end since they were seated in tight bores...that dimple was just enough to restrict the shaft from coming loose, but still allowed the shaft to rotate a little, allowing for lubrication...

 

It would have been nice if they had riveted one end of the shaft prior to shipping the kit.  I think the amount of effort it would take to come up with a riveting jig would be rather large, especially if drilling and tapping a couple of holes is a viable option.  In this case the shaft never rotates.  The original riveting guaranteed the shaft was fixed in one position.

 

I should have the shims back from the machinist later this week and will tackle the set screws after that.

 

Brad

 

 

 

Link to comment
Share on other sites

I finished modifying the hydraulic press and managed to get the worm pressed onto the shaft, just barely that is!  I added a 1-1/4" x 3" steel channel suspended below the frame as shown in the pictures.  This arrangement worked good until the last 3/8".  The channel was bowing to much for the worm to press on any farther.  I then laid a 2" x 6" chunk of steel channel on top of the 3" channel and that added just enough rigidity to the setup to allow for the last bit of movement.

 

Next weekend I'll see if I can figure out how to add set screws to the sector shaft.  

 

20200830_102146x.jpg.9ecf1e3fe4e6bf4ee4e346c631904a4e.jpg

 

20200830_102152x.jpg.c26b77eaa63868e650ca518e7eb37c2f.jpg

 

20200830_102139x.jpg.2b34df1f21c699fd34a1c1631be10cf0.jpg

 

20200830_103808x.jpg.538205d130992ec3f83cbcee58465879.jpg

 

 

Brad

 

  • Like 1
Link to comment
Share on other sites

I picked up the two resized spacers today.  He did a great job of getting the new roller to fit perfect in the opening, no slop but free turning.  Now that I've had a chance to look the sector shaft over I realize there is no room for set screws to be installed.  The area of a bore where you would normally expect to see a set screw is only 1/8" wide which is nowhere near enough surface area to work with.  So I guess it's going to be plan B to retain the shaft in the housing and that's spot welding.  Now I need to decide if I can use my MIG to do the job or if I should TIG it.  The problem with using TIG is I've only had it for a short time and haven't done much more than power it on a few times.  So if I use TIG I'm going to first have to learn how to use it!

 

20200901_180114x.jpg.7785d4cd3fed62ec03cfc657281d8a7a.jpg

 

20200901_180100x.jpg.57e817aba67a89de6cccea9d550ed403.jpg

 

20200901_180051x.jpg.6eaf0522adc117c43247da99b524705d.jpg

 

 

Brad

 

Link to comment
Share on other sites

I've stick welded cast iron hooks on loader buckets, preheating the cast iron and bucket steel cherry red to get less of a temperature spike during arcing...had to use O-A torch and be super careful after initial tacks to get everything back up to temperature without getting anything too hot...very nerve racking to get everything setup + preheated and welder dialed in cuz I only had one shot at it...probably the purtiest welds I ever made because of the preheating and let it cool off very slow, probably should have covered the area with sand to really slow the cooling...I practiced on metal of similar thicknesses to get the welder setting close before preheating, then only needed to turn it down a li'l when tacking...lots of work for such a small chore, but the end result was very robust and worry-free :cool:

  • Thanks 1
Link to comment
Share on other sites

23 hours ago, ggdad1951 said:

is there enough room for a internal C clip to get placed?  Machine a slot and make a spacer and retain it with a clip?

 

Interesting thought and one that I hadn't considered before.  The shaft might be long enough to allow for some sort of C clip, what I'm not sure of is if there is room to actually install the C clip.  This brings up an important question, would it matter if the shaft is allowed to slide side to side up to as much as .125" or more and would that be a precursor to failure?

 

I'll try and post some close up pictures sometime today.

 

Thanks!

 

Brad

Link to comment
Share on other sites

Looking things over the use of a C clip or circlip might be feasible.  I think the typical style of clip that uses snap ring pliers likely won't work due to clearance issues.   Probably the best chance of success would be to use clips similar to these.  A 

bearing-circlip-500x500.jpg.07d142fddc698bb04c52a111f64cd51b.jpg5KC96_AS01.jpg.c54e0ba4acd3126dcc78458fa6723545.jpg

 

Clips made from round wire might actually be the best choice.  I believe the grooves in the pins would be easier to make and the roundness of the wire will help with the concave openings where the pin was originally mushroomed.  

 

pro-x_piston_pin_circlip_kawasaki_22mm.jpg.4654cec0c6d0ce1105df57a23c7c00d7.jpg

 

 

As mentioned above the pockets in the sector housing are not flat, they are somewhat concave which would work well for a pin that is riveted into place.  The next question is whether or not the pin is long enough to have enough protrude from each end so a clip could be installed.  Installing one clip before pressing the pin into place will help but it still will be a tight fit on the other end trying to get the clip installed. 

 

20200903_092941x.thumb.jpg.158043f044d72ac5518f664a580dca73.jpg

 

20200903_092931x.thumb.jpg.9b3c04eba177c50f67c9d47b6ed455ee.jpg

 

20200903_092919x.thumb.jpg.b0b5fe01de6b5a71fbd938f56dad823f.jpg

 

 

Another thought I had was the possibility of drilling and tapping the ends of the shaft and using a socket head cap screw with a washer on each end of the shaft to keep it retained.  What I don't know as yet is whether there is room inside the housing for the additional length of the SHCS.   Maybe a button head would work?

 

Still another thought was the possibility of welding one end of the pin to create a ridge which would mean I would only have to weld the other end once it's pressed into the sector.  By the way, the pin is not a slip fit in the sector housing, its a press (or hammer) fit.  This complicates things a little because it makes trial and error fits more or less impossible.

 

Needless to say I have lots of measuring still to do.  

 

Here's a couple of pictures to show why I needed to replace the worm and sector roller.

 

20200903_093052x.jpg

 

20200903_093045x.jpg

Edited by bkahler
  • Thanks 1
Link to comment
Share on other sites

I re-read the supplier's suggestions on pin installation and maybe you can rivet this thing after all...if ya put a weld bead on the end of the pin, set the pin as instructed, fix the sector so that each weld bead can be mushroomed out with a 5# hammer and punch...if the weld bead pops off of the pin, then ya know that inadequate fusion took place and can adjust welder accordingly...

  • Thanks 1
Link to comment
Share on other sites

I am a couple weeks behind on this same rebuild, my rebuild kit was shipped yesterday.  Learning quite a bit, so thank you to all.  What about having the machine shop provide a new pin that extends 1/8 on each end beyond the supplied one and notching for c or circlip?

Link to comment
Share on other sites

Not sure how this would work, but this is the machine mentioned in the supplier's instructions. 

 

Perhaps you heat it up and follow with a blow from a rivet gun....

 

I'd be concerned about it welding the roller or bearings to the shaft. 

 

I'm sure at the Dodge factory they cranked out several per minute.

 

 

  • Like 1
Link to comment
Share on other sites

On 9/3/2020 at 11:36 AM, JBNeal said:

I re-read the supplier's suggestions on pin installation and maybe you can rivet this thing after all...if ya put a weld bead on the end of the pin, set the pin as instructed, fix the sector so that each weld bead can be mushroomed out with a 5# hammer and punch...if the weld bead pops off of the pin, then ya know that inadequate fusion took place and can adjust welder accordingly...

 

JB, after reading your post I went back and re-read their instructions and I definitely misinterpreted what they were saying.  For whatever reason I had inferred that the pin was to be welded to the cast iron sector housing.  That definitely isn't the case!   I probably would have messed things up big time if I had tried that.  

 

Their instructions say to: "Fix it with a little welding point on each end of the roller pin".  The way I interpret this is to weld around the end of the pin such that it can't slip or be pushed through the sector housing.  I don't think I would need to hammer on because there is enough of the pin accessible to reach the edge.  

 

Thanks!

 

Brad

Link to comment
Share on other sites

On 9/3/2020 at 5:35 PM, jerseycj8 said:

I am a couple weeks behind on this same rebuild, my rebuild kit was shipped yesterday.  Learning quite a bit, so thank you to all.  What about having the machine shop provide a new pin that extends 1/8 on each end beyond the supplied one and notching for c or circlip?

 

I'm going to keep the circlip idea on the back burner.  I think welding the ends of the pin is going to be the easiest and least expensive of the options.  I'm going to practice on the original pin using my extremely minimal TIG welding skills and see if I can produce a good enough bead that would keep the pin from sliding through.  Assuming I'm successful on the practice pin then I'll attempt it on the new pin.

 

 

Link to comment
Share on other sites

16 hours ago, John-T-53 said:

Not sure how this would work, but this is the machine mentioned in the supplier's instructions. 

 

Perhaps you heat it up and follow with a blow from a rivet gun....

 

I'd be concerned about it welding the roller or bearings to the shaft. 

 

I'm sure at the Dodge factory they cranked out several per minute.

 

John,

 

I'm with you, about what would happen passing the welding current through the shaft and bearings.  Watching the video I don't believe there would be any real deformation of the pin heads from force, it would have to all be done via welding. 

 

The original pin was definitely riveted in place using a hydraulic press of some sort.  I can see the dimpling affect in the tip of the original pin.  My guess is during original manufacturing the assembled sector was placed in a jig and a press stamped the pin from both ends at the same time.  

 

Like you said, several per minute!

 

Thanks,

 

Brad

Link to comment
Share on other sites

Yesterday morning I came to realize I was I trying to over analyze things and I was making this task harder than it needed to be.  Unfortunately over analyzing things seems to be something I'm really good at :)

 

So, putting aside all thoughts of screwing things up I clamped the old pin in the vice and powered up my mig welder.  I set the power level for 3/16" metal and applied a few test beads to the top of pin.  

 

20200906_105305x.thumb.jpg.53e13b2addb646dfbc95c4e3285921d8.jpg

20200906_105311x.jpg.772d4c8e69a323bb32384d90bd3b9887.jpg

 

 

I was satisfied with the results of the beads on the original pin so throwing caution to the wind I proceeded with welding beads on the new pin.  Before I installed the new pin and roller I took the roller bearings out and greased them with some wheel bearing grease.  Below you can see the welding results on the new pin.

 

20200906_100259x.jpg.1e580177d69761565034462ab951f0c7.jpg

 

20200906_100309x.jpg.cc5661d9cc968e587d0162d556c5fbc7.jpg

 

20200906_100328x.jpg.f8a3209f1f645123f62304e23ac09f40.jpg

 

20200906_100333x.thumb.jpg.013012e005aee9398258518e6e0bfe10.jpg

 

20200906_100351x.thumb.jpg.8297046ad1d414b3a1cafdba88f4ef0d.jpg

 

 

The steering gear housing is currently soaking in solvent and once it's clean I'll do an initial assembly to see how things look.

 

Brad

 

 

  • Like 3
  • Thanks 1
Link to comment
Share on other sites

This is the point where I was thinking them weld beads could be flattened out a little with a punch and a 5# hammer, to give your headed pin a little more lip for insurance, but if you've got about as much lip as the original rivets then you're golden :cool:

Link to comment
Share on other sites

3 hours ago, JBNeal said:

This is the point where I was thinking them weld beads could be flattened out a little with a punch and a 5# hammer, to give your headed pin a little more lip for insurance, but if you've got about as much lip as the original rivets then you're golden :cool:

 

Yeah I think there is more than enough bead sticking out past the side of the pin things should be good.

 

I temporarily assembled the worm and the sector today and things feels pretty good.  For whatever reason the existing brass bushings for the sector shaft are in excellent shape and I can't feel any slop or excess side to side movement when I try wiggling the shaft so I think I'll stick with the original bushings.  Also, I can't find a way to knock out the outer shell for the upper roller bearing on the worm.  I can't get a punch to rest against the back side of the shell which means I can't punch it out for replacement.  As near as I can tell the new bearings are identical to the originals so I'm going to leave the original shell in place and live with it.

 

So the next step is to clean and paint the housing and then assemble.  

 

Brad

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

24 minutes ago, jerseycj8 said:

So with the mig tack welds, it is not the intention to weld the pin to the housing, but just to add material beyond the diameter of the pin so the pin doesn't come out, correct?  The pin should still move freely.

 

Correct.  The pin actually doesn't move freely, at least not in my sector shaft.  It had to be driven into place with a hammer.  It's not exactly a press fit but it's close to it.

 

 

Link to comment
Share on other sites

Got the painting done this afternoon.  I'll let it dry for a few days and then start assembling sometime this week or next weekend.  I think tomorrow I'll clean and paint the outer steering column so it's ready to go.  

 

20200906_174341.jpg.4703d2a60c6ee92f960bb1fbd6ccc036.jpg

 

20200906_174234x.jpg.fb30e59385f7a60a4bacceb4d9683af2.jpg

 

 

The roller bearing shell I was referring to earlier can be seen in the picture below.  

 

20200906_174247x.jpg.a6826a81d88195f78dbaee035ca73426.jpg

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.

Terms of Use